[1]
Roni Febrianto et al. 2025. The Cost Claims due to Extension of Time on Construction Contracts (Case Study: Power Plant Project). International Journal of Law Policy and Governance. 4, 1 (Feb. 2025). DOI:https://doi.org/10.54099/ijlpg.v4i1.1230.